Small soil improvement machine - List of Manufacturers, Suppliers, Companies and Products | IPROS

Small soil improvement machine Product List

1~3 item / All 3 items

Displayed results

Contributing to a clean site: Zero waste and zero leftover soil ground improvement method.

Introduction to the Eco-GEO Method (Standard Type) and Eco-GEO ZERO Method (No Soil Discharge Type)!

We would like to introduce our residential crushed stone ground improvement work, "EcoGeo Method." With the EcoGeo Method (standard type), no waste (such as empty cement bags or cut steel pipes) is generated during construction, and no artificial materials are left underground. Furthermore, with the EcoGeo ZERO Method (no soil discharge type), no surplus soil is generated during excavation, allowing us to achieve "zero waste and surplus soil" from the construction phase into the future. 【Methods】 ■ EcoGeo Method (standard type) ■ EcoGeo ZERO Method (no soil discharge type) *For more details, please download the PDF or feel free to contact us.

  • Ground improvement
  • Small soil improvement machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cost reduction: Ground improvement method with a shorter design length than conventional method support piles.

The design length is shorter than that of conventional solid piles! Compared to other methods, it may also reduce the overall construction cost.

The Eco-GEO method is a replacement method rather than a support pile method. The weight supported by the "crushed stone reinforcement body" is distributed underground, so it does not require a solid foundation at the tip, and in many cases, the design length is shorter than that of conventional solid piles. Therefore, depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods. 【Features】 ■ Supports the weight of the building with both the "crushed stone reinforcement body" and the "original ground" ■ Does not require a solid foundation at the tip ■ In many cases, the design length is shorter than that of conventional solid piles ■ Depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods *For more details, please download the PDF or feel free to contact us.

  • Ground improvement
  • Small soil improvement machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduce the impact on the global environment.

Won the Excellence Award at the 49th Environmental Awards! Introducing the Eco-GEO construction method.

The Eco-GEO method is a ground improvement technology developed based on joint research between Onabe Corporation and Mie University, using only crushed stone. It is a ground improvement technology that has a low environmental impact and a low possibility of decreasing land value. This technology has been recognized for its lower CO2 emissions and lack of waste generation compared to conventional methods, and it received an Excellence Award at the 49th Environmental Awards. [Overview of the Environmental Awards] ■ Organizer: National Institute for Environmental Studies, Nikkan Kogyo Shimbun ■ Support: Ministry of the Environment ■ Awardees: Onabe Corporation, Mie University, Mie TLO Corporation *For more details, please download the PDF or feel free to contact us.

  • Ground improvement
  • Small soil improvement machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration